A condo repair scope of work template gives the property manager, the board and the contractor one written answer to the same question: what exactly is being fixed, where, to what standard, and how will everyone know it is done. The short version is that a good condo scope names the location down to the unit and the element, separates what is included from what is excluded, sets out access and building rules, and says who signs it off. Below is a template you can copy, a labelled example, and the points where a person has to make the call.
Why condo repairs need a tighter scope than a house job
A repair in a single-family home has one owner and one decision-maker. A condo repair rarely does.
In a condominium corporation (a strata corporation in British Columbia, a syndicate of co-owners in Quebec), the work might touch a unit, the common elements, or both. Who pays, who approves and who carries the insurance can depend on provincial legislation, the declaration, the bylaws and any standard unit definition. A vague scope like fix leak in 504 leaves every one of those questions open.
That ambiguity shows up later as:
- A contractor pricing the visible damage but not the source
- A unit owner assuming the corporation is paying for finishes
- A board approving a number without knowing what it covers
- Arguments at sign-off about whether the job is finished
The scope is where you settle these points before money is committed. It is not where you decide them on the board's behalf. If responsibility between the unit and the corporation is unclear, flag it in the scope and get a decision from the board or the corporation's advisers. Do not guess.
The condo repair scope of work template
Copy these headings into your work order or request for quote. Fill in every section, even if the answer is not applicable. A blank field reads as something nobody thought about.
- Job reference and parties. Corporation name and number, property manager contact, board approval reference if one is needed, contractor name.
- Location. Building address, unit numbers, floor, room and the specific element. For example: bathroom ceiling in unit 504, below the shower in unit 604.
- Unit or common element. Your current understanding of whether the work is to the unit, the common elements or both, and whether that has been confirmed. Mark it as unconfirmed if it has not.
- Problem description. What was reported, by whom and when. What has been seen on site. Photos attached.
- Work included. Numbered tasks in the order they will happen.
- Work excluded. Anything the contractor should not price or touch.
- Materials and finish standard. Match existing, specified product, or contractor to propose. Who supplies what.
- Access and building rules. Permitted working hours, elevator booking, parking, loading, noise limits, notice to residents, key or fob arrangements, who lets the contractor into each unit.
- Safety and permits. Any permits, shut-offs, fire system impairments or hazardous material checks the contractor needs to allow for, and who arranges them.
- Evidence required. Before, during and after photos. Any test results, readings or reports.
- Pricing basis. Fixed price, time and materials with a cap, or a provisional sum for unknowns. How sales tax is shown.
- Changes. How the contractor reports something unexpected and who can approve extra work.
- Completion and sign-off. What done looks like and who confirms it.
How to fill in the hard sections
Location and boundaries
Be more specific than feels necessary. Name both units when a leak crosses a floor. Say which side of a wall, which balcony, which riser. Attach a marked-up photo or floor plan if you have one. A contractor who has never been in the building should be able to find the job from the scope alone.
Work included and excluded
Write included tasks as actions with an end point. Open ceiling to locate source of leak is better than investigate leak, because it tells the contractor where the first stage stops.
Exclusions are where most condo disputes are avoided. Common ones:
- Finishes inside the unit beyond the repaired area
- Owner improvements such as upgraded flooring or custom millwork
- Repairs to other units not named in the scope
- Contents, moving furniture or storage
- Work that needs a separate trade not listed
If you are not sure whether something is in or out, say so and ask the contractor to price it as a separate line.
Unknowns and staged work
Many condo repairs start with an investigation. You do not know whether the leak is a failed shower seal or a riser until the ceiling is open. Split the scope into stages:
- Investigate and report, with photos, at a fixed price
- Decision point: manager and, if needed, board review the findings
- Repair as agreed, priced once the cause is known
- Make good to the agreed finish standard
This stops a contractor guessing at a repair price and stops the corporation approving work nobody has seen.
Access and building rules
Condo access fails more jobs than workmanship does. List the building's working hours, how far ahead elevator pads or bookings are needed, where vans can park and how residents will be told. If an owner or tenant must be home, say who is arranging that. If the building needs notice before entering a unit, check the requirements that apply to your building and province, and build that time into the dates.
Illustrative example: leak through a bathroom ceiling
This is a fictional example to show the template in use.
A resident in unit 504 reports water staining on the bathroom ceiling. The unit above, 604, has a bathroom in the same position.
- Location: bathroom ceiling, unit 504. Shower and tub area, unit 604.
- Unit or common element: unconfirmed. Source not yet known.
- Included, stage 1: inspect 604 shower and tub seals, open a section of 504 ceiling, identify the source, photograph and report.
- Excluded: any repair, painting or replacement of finishes until the cause is reported.
- Access: working hours as set by the building rules. Manager to arrange entry to both units with notice. Elevator booking not needed.
- Evidence: photos before opening, at the source and after temporary protection.
- Pricing: fixed price for stage 1. Stage 2 priced after the report.
- Sign-off: property manager confirms the report is received. Next step decided before any repair proceeds.
The scope does not decide who pays. It produces the evidence the manager and board need to decide.
What needs a person's decision
A template makes work clearer. It does not make decisions. These stay with people:
- Whether the work falls to the unit owner or the corporation
- Whether board approval is needed and at what value
- Which contractor is awarded the job
- The agreed price and any extra work
- Whether to involve insurers or the corporation's advisers
- Final sign-off that the work meets the scope
If you are unsure about legal responsibility, notice periods or insurance, check your provincial condominium legislation, the declaration and bylaws, and take advice from the corporation's lawyer or insurer.
Running a condo scope through Plan@Job
Plan@Job is AI-powered project and operations management for construction and property businesses. It is built around the same structure as the template above.
When a job brief comes in, Sophie Bennett, the AI Enquiries Coordinator, checks it for missing information, such as an unclear location or no photos, and asks for clarification. If the gaps are still there after two attempts, she hands the job to a person rather than guessing.
On the contractor side, the operator (the contractor business managing clients, delivery, subcontractors and in-house operatives) can split the job into internal stages, each with its own scope, dates, status and costs. That maps neatly onto investigate, decide, repair and make good. Stages can be delivered in-house or subcontracted. The client sees the overall agreed scope and price and the evidence that is shared with them. Internal stage costs and subcontractor identity stay internal. You can read more on the project management features page.
Daniel Reed, the AI Operations Manager, supports follow-ups on quotes and proposed dates, so a stalled quote gets chased. Awarding the work, setting the price and approving changes remain decisions for the people involved. More on how the AI staff work is on the AI staff page.
Plan@Job is currently live in the UK. If you manage or maintain condos in Canada, the Canadian property managers page is where you can register your interest.
FAQ
Should the property manager or the contractor write the scope of work?
The property manager usually writes the first version, because they know the building, the rules and the approval process. The contractor should then review it, ask questions and point out anything missing before pricing. The final scope should be agreed by both before work starts.
How detailed should a condo repair scope be for a small job?
Detailed enough that a contractor who has never visited could find the job, price it and know when it is done. For a small job, some sections may be a single line, but keep every heading so nothing is skipped.
What if the contractor finds something outside the scope?
The contractor should stop at a safe point, photograph it and report it before doing extra work. The changes section of the scope should say who can approve additions. Unapproved extras are one of the most common causes of payment disputes on condo jobs.