Strata Maintenance Request Priority Levels: A Practical Guide

Set clear strata maintenance request priority levels so emergencies, urgent repairs and routine jobs reach the right contractor at the right time.

Strata Maintenance Request Priority Levels: A Practical Guide

Strata maintenance request priority levels are the agreed categories that tell owners, tenants, the strata manager and contractors how fast a reported problem needs a response and who is allowed to act on it. Most strata buildings run well on four levels: Emergency, Urgent, Routine and Planned. Each level needs three things written down: the triggers that put a request there, the response target your strata council has approved, and the person who can authorize the work. Get those three right and most arguments about slow repairs or surprise invoices go away.

This guide is for strata managers and the maintenance contractors who serve strata corporations. The terminology here follows strata practice, as used in British Columbia and Alberta. If you manage condominium corporations in Ontario or a syndicate of co-ownership in Quebec, the triage logic is the same, but check your own provincial legislation, declaration and bylaws for who is responsible for what.

Why priority levels matter in a strata

A strata building has more people with an opinion on a repair than a rental house does. An owner reports a leak. A tenant in the unit below reports the stain. A council member walks past and sends a photo. The caretaker has already shut off a valve.

Without agreed priority levels, every one of those messages sounds urgent. Contractors get called out at night for jobs that could wait until Tuesday. Real emergencies sit in an inbox because they arrived as the fourth email in a thread.

Clear levels fix three practical problems:

  • Speed where it counts. Life safety and active damage get handled first, every time.
  • Spending control. The council knows which jobs the strata manager can approve on the spot and which need a council decision.
  • Fair expectations. Owners know what response to expect, and contractors know what they are being asked to commit to.

A four-level model that works

The response targets below are deliberately left for your council to set. They depend on your building, your contracts and your contractors' real availability. Write targets you can actually meet.

Level 1: Emergency

An immediate risk to people, or active damage that gets worse by the hour.

Typical triggers:

  • Smell of gas. Tell occupants to leave and call the gas utility's emergency line or 911 first. The maintenance request comes second.
  • Fire alarm or sprinkler system fault, or any fire safety system out of service.
  • Active water ingress affecting more than one strata lot or electrical equipment.
  • Loss of heat to the building in cold weather, where frozen pipes or occupant health are at risk.
  • Main entry, parkade gate or elevator failure that traps someone or leaves the building unsecured.
  • Sewer backup into common property or units.

The goal for an emergency is to make safe, not to complete the full repair. Shut off, isolate, board up, extract water. The permanent fix usually moves to Urgent or Planned once the risk is controlled.

Level 2: Urgent

A real problem that affects use of the building or will cause damage if left, but is not an immediate danger.

Typical triggers:

  • A slow leak that is contained but not fixed.
  • One elevator out in a building with two.
  • Common area lighting out in a stairwell or parkade.
  • Hot water failure to part of the building.
  • Make-safe work completed after an emergency, now needing the proper repair.

Level 3: Routine

Wear and tear and minor faults that can be scheduled.

Typical triggers:

  • Sticking common area doors or closers.
  • Minor drywall or paint damage in hallways.
  • Dripping taps in amenity rooms.
  • Landscaping or irrigation adjustments.

Level 4: Planned or project work

Work that comes from inspections, your depreciation report or council decisions rather than a single reported fault. Roofing, envelope repairs, boiler replacement and repainting sit here. These often need quotes, a council vote and sometimes an owners' approval process under your bylaws and provincial rules.

Who decides what

A priority label is only useful if everyone knows who can act on it. Before you publish your levels, agree on these points with the council:

Common property or strata lot

Check whether the reported item is common property, limited common property or inside a strata lot. Your bylaws and provincial legislation set the starting point. If an owner's own fixture is leaking into common property, the emergency response may still be the strata's to coordinate, but the cost question is separate. Do not settle cost responsibility on the night of an emergency. Make safe, record everything and let the council decide later.

Spending authority

Most councils give the strata manager authority to approve emergency work up to an agreed amount, and require council approval above it. Write that amount into your maintenance policy. If you are a contractor, ask for it in writing before you accept after-hours call-outs from a new strata.

After-hours contact

Name one person, or a rotation, who can authorize emergency work outside business hours. A caretaker who can open the mechanical room is not the same as someone who can approve the spend.

How to triage a request in five steps

Use the same steps for every request, whether it arrives by email, phone or a portal.

  1. Check for danger first. Gas, fire, electrical or someone trapped. If yes, direct people to emergency services and then treat it as Level 1.
  2. Get the missing facts. Location, unit number, photos, when it started, whether it is getting worse, and whether anyone has already shut anything off.
  3. Decide common property or strata lot. This tells you whether the strata is arranging the work.
  4. Assign the level and the approver. Match the request to your written triggers, not the tone of the message.
  5. Brief the contractor properly. Send the level, the access arrangements, the photos and the approval limit together.

Step 2 is where most delays start. A request that says "water in the hallway" with no floor or unit number can cost an hour of phone calls.

What contractors need from a priority label

If you are the maintenance contractor, a priority label on its own is not a brief. Ask the strata manager to agree a standard set of information for each level.

For Emergency and Urgent jobs:

  • Exact location and access details, including fob, key or caretaker contact.
  • Who on site can isolate water, power or gas.
  • The approved spend for make-safe work.
  • Who to call before going beyond that amount.

For Routine and Planned work:

  • Scope and photos.
  • Preferred access windows and notice requirements for occupants.
  • Whether a quote is needed before work starts.

It also helps to agree, in advance, which kinds of work you will not cover after hours. A clear "no" up front is better than a missed emergency.

Illustrative example

This is a fictional scenario to show the workflow.

A strata manager receives a message on a January evening: "No heat on the third floor." Using the five steps, they ask the reporting owner whether radiators are cold in all units on the floor or one, and check the outdoor temperature. Several units are affected and it is well below freezing, so they classify it as Emergency. They call the on-call mechanical contractor, confirm the approved make-safe amount and give the caretaker's number for boiler room access.

The contractor restores partial heat that night and reports that a circulation pump needs replacing. The manager moves the replacement to Urgent, requests a quote the next morning and puts it to the council because it sits above the manager's approval limit.

One report, two priority levels, two different decision-makers. That is the system working.

Where Plan@Job fits

Plan@Job is AI-powered project and operations management for construction and property businesses. It is built around job briefs, project stages and clear human approval.

For triage, Sophie Bennett, the AI Enquiries Coordinator, checks existing job briefs for missing information, such as location or photos, and asks for clarification. If two attempts do not get an answer, Sophie hands the job back to a person. Sophie does not decide your priority level or approve spending.

Daniel Reed, the AI Operations Manager, supports sharing eligible jobs with your existing vetted network, follows up on quotes and proposed dates, and prepares a morning brief so you can see what is outstanding. Awarding work and agreeing prices stay with you. You can read more about how these roles work on the AI staff page.

For contractors, Plan@Job uses the term Operator for the contractor business that manages clients, project delivery, subcontractors and in-house operatives. Planned strata work such as an envelope repair can be split into internal stages with scope, dates, status and costs, while the client sees the agreed overall scope and price.

Plan@Job is currently live in the UK. If you manage strata buildings in Canada, see the Canadian property managers page to check availability and register your interest. Contractors serving Canadian stratas can do the same on the Canadian contractors page.

FAQ

How many priority levels should a strata use?

Three or four is enough for most buildings. More levels make triage slower and lead to arguments about borderline cases. Emergency, Urgent, Routine and Planned cover almost every request.

Who sets the response times for each priority level?

The strata council, usually on advice from the strata manager and after talking to the contractors who will do the work. Set targets your contractors can actually meet, write them into your maintenance policy and review them each year.

Can a request change priority level after it is logged?

Yes, and it often should. An emergency usually becomes an urgent or planned repair once the immediate risk is controlled. Record each change, who made it and why, so the council can follow the decision trail later.