A condo maintenance work order template needs to capture six things: who reported the problem, exactly where it is, whether it sits in a unit or the common elements, who can approve the spend, how the trade gets access, and what evidence closes the job. Put those on one page and most of the back-and-forth between owners, the board, the superintendent and the contractor goes away. Below is a template you can copy, then the reasoning behind each section and the points where a person still has to make the call.
Why condo work orders go wrong
Condo jobs are harder than a single landlord's repairs because more people have a say. An owner or resident reports the problem. The property manager logs it. The board, or a spending limit the board has delegated, decides the money. The superintendent may hold the keys. The contractor needs a clear scope and a way in.
When any of those links is missing, the same problems repeat:
- The location is vague, so the trade visits the wrong unit or riser.
- Someone assumes the corporation is responsible before checking the governing documents.
- Nobody records who approved the work or the spending limit.
- Access is not arranged, so the visit is wasted.
- The job is closed without photos, so a later dispute has nothing to rely on.
A good template forces each of those answers before the job moves to the next step.
The condo maintenance work order template
Copy these sections into your form, spreadsheet or job system. Keep the field names the same each time so the board, the superintendent and your contractors learn where to look.
1. Request details
- Work order number
- Date and time received
- Reported by: name, unit number, phone, email
- Reporter type: owner, tenant, staff, board member, contractor
- How it was reported: portal, email, phone, in person
2. Location
- Building and address
- Unit number, floor and exact spot (for example, ceiling above the kitchen sink, unit 1104)
- Area type: unit, common element, exclusive-use common element (such as a balcony, parking space or locker)
- Related units that may be affected, above, below or beside
Terminology differs by province. In British Columbia you will see strata lot, common property and limited common property. In Quebec, the declaration of co-ownership refers to private and common portions. Use the terms in your building's own documents.
3. Problem and priority
- Description in the reporter's words
- Description after first inspection
- Photos or video attached: yes or no
- Priority: emergency, urgent, routine, planned
- Reason for the priority chosen
4. Responsibility check
- Clause or schedule checked in the declaration, bylaws or rules
- Initial view: corporation, owner, or unclear
- Insurance considered: yes, no, not applicable
- Checked by and date
5. Approval
- Estimated cost or quote reference
- Within the manager's delegated spending limit: yes or no
- Approved by (name and role) and date
- Board approval required: yes or no, and reference to the decision
6. Access
- Access needed to: unit, common area, mechanical room, roof, parking level
- Notice given to: owner, tenant, neighbouring units
- Notice date and method
- Key or fob arrangements, who meets the trade
- Elevator booking or protection needed
7. Assignment
- Contractor or in-house staff assigned
- Trade and licence type where the work requires one
- Proof of insurance on file
- Workers' compensation clearance on file where applicable (for example WSIB in Ontario or WorkSafeBC in British Columbia)
- Agreed price or pricing basis
- Proposed attendance date and confirmed date
8. Completion and sign-off
- Work carried out
- Materials used
- Before and after photos
- Follow-up work needed
- Completed by and date
- Checked by (manager or superintendent) and date
9. Costs and recovery
- Invoice number and amount, with GST or HST shown as applicable
- Charged to: operating budget, reserve fund, owner chargeback, insurance claim
- Decision reference for any chargeback
Filling in the fields that cause disputes
Most sections are simple record keeping. Four of them carry the real risk.
Responsibility
Do not decide who pays based on habit. Repair and maintenance obligations, and when the corporation can recover costs from an owner, depend on provincial condominium legislation and the building's declaration, bylaws and rules. Record which document you checked. If the answer is unclear, mark it unclear and escalate. A chargeback to an owner should come from a board decision or clear authority, not from a contractor's invoice.
Priority
Write down why you chose the priority. An active leak into a unit below, a failed main entrance lock in January or loss of heat is not the same as a sticking closet door. Agree simple definitions with the board in advance so the manager is not debating priority at 11 p.m.
Access and notice
Provincial rules and your governing documents set out when and how the corporation can enter a unit. Requirements differ, and genuine emergencies are usually treated differently from routine work. Check the current rules for your province and record the notice you gave. If a tenant lives in the unit, note who you told and how.
Closing the job
A job is not finished when the contractor leaves. It is finished when someone has checked the work, the photos are on file and the cost is allocated. Closing too early is the most common reason a recurring leak becomes an argument about who knew what.
Illustrative example
This is a fictional scenario to show how the template works.
A resident in unit 804 reports a brown stain spreading on the bathroom ceiling. The manager logs the request, asks for photos and records the location as the bathroom ceiling, unit 804, with unit 904 noted as possibly involved. The superintendent attends, finds the ceiling damp and confirms water is coming from above.
Priority is set to urgent with a reason: active water, risk of further damage. The manager gives notice to the owner of 904, books a plumber within the delegated limit and records the approval. The plumber finds a failed toilet supply line inside 904.
The responsibility field is marked unclear. The supply line is inside the unit, but whether the corporation or the owner pays depends on the declaration and any standard unit description. The manager escalates it to the board with photos, the plumber's report and the invoice. The board makes the call. The work order records the decision and closes once the ceiling in 804 is checked dry.
How the workflow runs in Plan@Job
Plan@Job is AI-powered project and operations management for construction and property businesses, and maintenance is one of its main uses. In Plan@Job, the Operator is the contractor business that manages clients, project delivery, subcontractors and its own operatives. Property managers and Operators can work from the same job record instead of chasing emails.
The AI staff help with the routine parts, while people keep the decisions:
- Missing details. Sophie Bennett, the AI Enquiries Coordinator, checks an existing job brief for missing information, such as a vague location or no photos, and asks for clarification. If two attempts do not get the answer, the job is handed to a person.
- Finding a trade. Daniel Reed, the AI Operations Manager, supports sharing eligible jobs with the existing vetted network and follows up on quotes and proposed dates. He also prepares a morning brief so the team can see what needs attention.
- Decisions. Awarding the job, agreeing the price and approving spend stay with people. Nothing is awarded or paid automatically.
- Larger common-element work. For jobs like a corridor refresh or balcony repairs, the project plan splits the work into internal stages with scope, dates, status and costs. The client sees the overall agreed scope and price plus shared evidence. Internal stage costs and subcontractor identities stay internal.
You can read more about how the assistants work on the AI staff page.
Plan@Job is currently live in the UK. Canadian property managers can check availability and reserve a place on the Canadian property managers page. Maintenance contractors in Canada can do the same on the Canadian contractors page.
FAQ
Should owners fill in the work order themselves?
Let owners fill in the request, location and problem sections, ideally with photos. Keep the responsibility, approval and cost sections for the manager and the board. Owners should not be deciding who pays.
Do I need a separate template for emergencies?
Use the same template so the record stays consistent. For emergencies, allow the manager to act first under a pre-agreed authority and complete the approval and responsibility sections as soon as the situation is safe.
How long should we keep completed work orders?
Keep them for at least as long as your records obligations, insurance needs and the building's reserve fund planning require. Check current provincial requirements and your corporation's records policy rather than relying on a general rule.